Residential

Audley Square House, London
Early engagement works direct for Caudwell Collection on an exciting new Super Prime development in London. Stage 3 - 4 MEP co-ordination of 1No. Apartment to LOD400 to mitigate design issues and set principles for the Fit Out package.
The Yard at Ivanhoe, Orlando
Ibsecad Appointed by Owner. Construction Manager and Architect to do a peer review of the Architectural and Structural Design Documents and Revit Models.
Chelsea Barracks Phase 4, London
Early design validation works for Qatari Diar on 2No. Apartment units.
Followed by securing Electrical Shell & Core Contract co-ordination for Gratte Brothers with Multiplex and Dornan as LEad Mechanical & PH Co-ordinators.
Elephant & Castle MP3, London
Architectural modelling package for Platt & Reilly. Delivering 3D models to LOD400 for the Drylining and Ceiling package across 4 Blocks.
DAMAC Tower, London
Lead MEP Co-ordinators for Multiplex under direct appointment working alongside the Sub & Trade contractors.
55-91 Knightsbridge, London
Lead MEP co-ordinators for Dornan Engineering with Sir Robert McAlpine. Retained facade and new Construction behind.
One Crown Place Residential, London
Technical Model Managers during Stage 3-6; mitigating design issues prior to Sub-Contractor appointment. Early Engagement modelling lead to novation to Shell & Core (MJL & TClarke) and Fit Out (Borough ES)
60 Curzon Street, London
Early engagement works on 6No. Apartments from Stage 3 design information into a LOD400 Stage 4 delivery for Imtech with Balfour Beatty during the PCSA period.
Camden Lock Village, London
Technical Model Managers during the Stage 3 to 4 completion for MACE across Camden's newest Residential development.
1-3 Grosvenor Square, London
Early engagement works for Mace leading to Full MEP Co-ordination for Imtech on this challenging D&B Project.
Prefabrication principles developed for Risers; Corridors & Main Energy Centre.
East Village N08, London
Shell & Core MEP Co-ordinators for MACE, lead the Prefabrication strategy supporting MACE's "Rising Factory" construction principle - Riser & Corridor Modules; Residential Utility Cupboards.
Chelsea Barracks Phase 2&3A, London
Lead MEP Co-ordinators for Imtech with Mace for 13No. 7 Storey Townhouses and 1 4 Storey Mews House - Super Prime high end Residencies on the site of the former Chelsea Barracks.
Good Luck Hope Phase 1, London
Full MEP Co-ordination for Borough ES on Phase 1 at Ballymore's next major new development in East London.
Victoria Square, Woking
Technical Model Managers for Sir Robert McAlpine during Stage 3 to 4.
Shard Place, London
Technical Model Managers for Mace during Stage 3 to 6.
Novation to Shell & Core MEP Co-ordination for Halsion.
Centrepoint Tower, London
Lead MEP Co-ordinators for Lorne Stewart with Multiplex on this Iconic London tower. Challenging existing building issues overcome with site based team leads to review key areas.
Royal Wharf Phase 1 & 2B
Shell & Core MEP Co-ordination at Phase 1 and Full SC & Fit Out on Phase 2B for Borough ES and Ballymore.
Kings Cross R6, London
Lead MEP Co-ordinators for MJL on Shell & Core areas another Ibsecad building in the Kings Cross regeneration plan.