Public
3D Modelling and Co-ordination for Airblast with Sir Robert McAlpine. New development for Submarine sectional painting. Specialised equipment and component modelling dealing with Dust and Fume extraction.
New entrance refurbishment at Selfridges flagship store. MEP Co-ordination direct for JV - Sir Robert McAlpine and Blue Sky Building.
Lead MEP Co-ordinators for brand new Hotel development in Liecester Square, direct appointment to Edwardian Group with Blue Sky Building as Construction Managers.
Initially Ibsecad were engaged by AECOM to complete BIM Management & Reports on the Intermodal Terminal Facility and South Airport APM Complex. Due to the Success of Ibsecad initial engagement our BIM Management & Report services have been retained for the New South Terminal Complex Phase 1 and Phase 1 Expanded.
New Hotel and Residential landmark in Stratford for Manhattan Loft Gardens client. MEP Co-ordination across key areas of the scheme for Bouygues.
Facing Lincoln’s Inn Fields and close to Chancery Lane and Holburn, near the Royal Opera House, Covent Garden and Theatre District. Club Quarters, Lincoln’s Inn Fields is a full service hotel offering a full range of accommodations in a club–like atmosphere.
Lead MEP Co-ordinators for BL Harberts and Sir Robert McAlpine on the new US Embassy site in Vauxhall.
Lead MEP Co-ordinators on several buildings for Skanska Rashleigh Weatherfoil for new Training facilities on the existing Worthy Down RAF Base.
Lead MEP Co-ordinators for Lambeths New Town Hall and Civic Centre. Challenging existing build in the Town requiring multiple site visits. Working direct for NG Bailey and NGB Offsite for the Energy Centre on top of the new Civic Centre.
The Royal Royal Festival Hall is a 2,900 seat concert, dance and talks venue within Southbank Centre in London. It is situated on the South Bank of the River Thames, not far from Hungerford Bridge. It is a Grade I listed building - the first post-war building to become so protected (in April 1988).
Lead MEP Co-ordinators for NG Bailey across Stage 2A.
£90M Data Centre MEP Co-ordination & Prefabricated Modules for Dornan with MACE. 4No. Huge COLO's and associated Plant & Administration offices.
Plumbing Coordination and Shop Drawings for Falasca Mechanical.
Sea Containers House is a prominent river front building situated between OXO Tower and Blackfriars Bridge. During the £100m overhaul, 13 floors of current office space will be converted to provide a 360-bedroom hotel.
HIghly detailed Water treatment works with Prefabricated plant and pipework systems.
MEP co-ordination & surveys during refurbishment.
MEP Lead Co-ordinators.
District Heating infrastructure co-ordination including prefabricated Plantroom substations around the site.