PRINCIPAL PLACE EXPANSION PHASE 2

Update

Mechanical and Public Health services coordination throughout 9 floors of mixed use office spaces, In collaboration with Michael J Lonsdale & ISG.

Project set up is underway and site preliminary works are moving swiftly forward.

Woking are fired up for fast paced fit-out package.

33 KING WILLIAM STREET – WELLS FARGO

Update

After delivering the Shell & Core with NG Bailey for 33KWS; securing the Fit Out with MJL & ISG was a fantastic opportunity further continue our works here.

Due Dilignece surveys were undertaken to validate the base build installation along with the use of point cloud scanning technology, we were able to quickly determine discrepancies between the as-built models and what actually existed on site.

By doing this we were able to expedite unforeseen coordination issues and produce proposals to alter the design to suit. A fantastic collaboration with MJL resulting in efficient solutions.