One Crown Place Logistics

3D Logistics benefits

We managed to grab a great Logistics model comparison vs Site conditions down at One Crown Place recently.

Ibsecad & Mace worked closely during the PCSA period on the Logistics modelling and co-ordination to ensure zero issues would occur out on site during the Basement construction.

Props and incoming/outgoing service penetrations were carefully co-ordinating against programme sequence as well as checking co-ordination with the main Crane grillage (see the prop passing through the steel structure perfectly)

There have been no reported co-ordination issues on site and high praise against carrying out this activity in the model environment.