Ibsecad secure European Data Centre

Utilising our skills in Design for Manufacture and Assembly

 

Main Contractor, Mace engaged us during the 60-100% design stage. We were initially tasked with reviewing the construction methods required to deliver this project faster.

Our prefabrication experience shone through here and some of our methods used on the recent Hospital projects were adapted to suit this Data Centre.

Having achieved design sign off for these construction method ideas in January, the 100% design IFC file was released to us to commence final detailing to LOD400.

To complete this exercise, Ibsecad were novated to Dornan Engineering Services; who we have an exception relationship with, to deliver the full Installation, Manufacture & As Built drawing package.

We will update you in the next quarter on how the project is progressing and the enhancements and benefits we are driving with this project.